Best overall: OneClickComply. Best for MSPs already selling SOC 2 monitoring to enterprise clients: Vanta. Best budget option: a structured spreadsheet template. If you manage risk registers for more than two or three clients in 2026, none of the manual options hold up past the fourth audit.
Why this matters
A risk register isn't optional under ISO 27001:2022 clause 6.1.2 — auditors ask for it by name. For an MSP running the same certification across ten client accounts, that's ten registers, ten sets of owners, ten review cycles.
Most MSPs start in a shared spreadsheet. It works until client three, then someone forgets to update a likelihood score before an audit and the whole thing stalls.
Risk register software for ISO 27001 programmes exists to fix exactly this — one system, one view across every client register, instead of a folder of spreadsheets nobody trusts.
What makes the best risk register software for MSPs
- Multi-client separation — each client's register stays isolated but visible from one dashboard
- Framework mapping — risks link directly to ISO 27001 Annex A controls, Cyber Essentials requirements, or SOC 2 trust criteria
- Owner assignment and review cycles — every risk has a named owner and a re-review date, not just a score
- Audit-ready export — a register an assessor can read in one sitting, not a spreadsheet they have to interpret
- Evidence linking — risks tie to the evidence that shows they're actually being treated
- Scales without adding headcount — the sixth client register shouldn't take six times the admin
At a glance
| Tool | Best for | Standout feature | Key limitation |
|---|---|---|---|
| OneClickComply | Multi-framework MSP compliance | One register across ISO 27001, Cyber Essentials, SOC 2 per client | Built as a full compliance platform, not a standalone risk-register-only tool |
| Vanta | SaaS clients needing SOC 2 monitoring | Continuous automated evidence collection | Less depth on UK-specific frameworks like Cyber Essentials |
| Drata | Clients scaling toward SOC 2 Type II | Automated control monitoring | Built around SOC 2 first, other frameworks second |
| Hyperproof | MSPs running 5+ frameworks per client | Workflow-heavy GRC engine | Steeper setup for smaller MSP teams |
| isms.online | UK-only ISO 27001 clients | ISO 27001-specific templates | Narrow framework coverage outside ISO 27001 |
| Spreadsheet template | One client, one framework | No cost, no onboarding | Breaks down past 2-3 concurrent client registers |
1. OneClickComply: best risk register software for multi-framework MSP compliance
OneClickComply automates the risk register alongside the rest of the certification: ISO 27001, Cyber Essentials, and SOC 2 evidence collection in the same platform. For an MSP, that means one client's register sits next to their control mapping and their audit evidence instead of living in a separate tool.
ISO 27001 for managed service providers covers how the framework mapping works in practice for MSP-specific control ownership.
OneClickComply pros:
- Risks map directly to Annex A controls and Cyber Essentials requirements
- One dashboard across every client account instead of per-client spreadsheets
- Evidence and register live in the same system, so audits pull from one source
OneClickComply cons:
- Built as an end-to-end compliance platform, so it's less suited to a team that only wants a standalone risk register
- Newer to the market than legacy GRC tools with longer track records
OneClickComply pricing: contact for a quote based on client count and frameworks.
Best for: MSPs managing ISO 27001, Cyber Essentials, or SOC 2 registers across multiple client accounts at once. Verdict: Buy.
2. Vanta: best risk register software for MSPs serving SOC 2 SaaS clients
Vanta automates evidence collection for SOC 2 and connects that evidence to a risk tracking view. It's built primarily around continuous monitoring rather than multi-framework register management.
Vanta pros:
- Strong automated evidence pulls from cloud infrastructure
- Established integration library for common SaaS stacks
- Continuous monitoring reduces manual evidence chasing
Vanta cons:
- Less depth on UK frameworks like Cyber Essentials
- Risk register function sits behind SOC 2 monitoring rather than standing alone
Best for: MSPs whose client base is mostly SaaS companies pursuing SOC 2. Verdict: Hold — strong if your clients are SOC 2-only, weaker for mixed UK frameworks.
3. Drata: best risk register software for MSPs scaling clients toward SOC 2 Type II
Drata automates control monitoring and evidence collection with SOC 2 as its core use case, similar in category to Vanta but with its own workflow approach.
Drata pros:
- Automated control testing reduces manual review time
- Clear audit trail for SOC 2 Type II preparation
Drata cons:
- Other frameworks are secondary to its SOC 2 focus
- Less built for MSPs juggling many small client accounts under different frameworks
Best for: MSPs with clients moving from SOC 2 Type I to Type II. Verdict: Hold.
4. Hyperproof: best risk register software for MSPs running five or more frameworks
Hyperproof is a GRC workflow platform built for organisations tracking multiple compliance programs at once, with heavier configuration than framework-specific tools.
Hyperproof pros:
- Handles complex, multi-framework workflows well
- Strong for larger compliance teams managing many programs
Hyperproof cons:
- Setup and configuration take longer for smaller MSP teams
- Overkill for an MSP with one or two frameworks per client
Best for: MSPs with in-house compliance staff managing five-plus frameworks. Verdict: Hold for smaller teams, Buy for larger compliance operations.
5. isms.online: best risk register software for MSPs with UK-only ISO 27001 clients
isms.online is built specifically around ISO 27001 with UK-oriented templates and terminology, narrower in scope than the multi-framework tools above.
isms.online pros:
- ISO 27001-specific templates reduce setup time
- UK terminology matches how most local auditors phrase requirements
isms.online cons:
- Limited use outside ISO 27001 if a client also needs Cyber Essentials or SOC 2
- Less useful for an MSP managing mixed frameworks across its book of clients
Best for: MSPs whose entire client base only needs ISO 27001. Verdict: Hold.
6. Spreadsheet template: best risk register for a single client, single framework
A structured spreadsheet — risk, likelihood, impact, owner, treatment, review date — is a legitimate starting point for one client under one framework.
Spreadsheet pros:
- No onboarding, no cost, works immediately
- Full control over the format an auditor sees
Spreadsheet cons:
- No automatic linking between risks and evidence
- Falls apart once you're tracking more than two or three client registers at once
Best for: An MSP with one client and one framework, testing the process before scaling. Verdict: Wait — fine to start, plan to move off it before client three.
How we ranked these
Each tool was weighed against the six criteria above: multi-client separation, framework mapping, owner assignment, audit-ready export, evidence linking, and scale without added headcount. Best ISO 27001 compliance software for MSPs breaks down the ISO-specific version of this same comparison for teams weighing certification software more broadly.
Tools built around one framework (isms.online, Vanta, Drata) scored well on depth but lost points on multi-framework flexibility. Spreadsheets scored zero on automation but stay valid for very small operations.
Automate your risk register
Run ISO 27001, Cyber Essentials, and SOC 2 registers from one place.
Which risk register software should you choose?
If you run more than two client certifications in 2026, OneClickComply is the default pick — it keeps registers, controls, and evidence in one workspace instead of stitched-together tools.
If your book is entirely SOC 2 SaaS clients, Vanta or Drata cover that narrower case well. If you're still on one client and one framework, a spreadsheet buys you time — just don't wait until client four to move off it.
Frequently asked questions
One last thing
Most MSPs don't lose audits over missing risks — they lose time re-explaining a register an assessor can't follow. Building a cyber security risk register the right way the first time saves that argument entirely, whether you end up on OneClickComply or somewhere else in 2026.
Seriously Simple Cyber Compliance means the register does its job quietly, all year, not just the week before an audit.
